The inspection took place over two phases; phase one took place in March 2009 and interim findings were left with TWL at that time. The second phase of the inspection took place over three days in October 2009 and involved a team of five inspectors.
This report is based on an inspection of TWL and a sample of the work of five sub-contractors.